PROPOSED PROJECTS

The proposal is organized into two separate propositions, each outlining specific projects.

View detailed information of each proposition below.

PROPOSITION A CONCEPTUAL RENDERINGS

(Click image to enlarge)

PROPOSITION A CONCEPTUAL RENDERING VIDEO

PROPOSITION B CONCEPTUAL RENDERING

EXISTING FACILITY CONDITIONS

Existing Band Hall

Existing High School Locker Room

Existing Track

Redwater ISD Bond 2026